Claughton Moor

From Cumbria Wind Watch

Jump to: navigation, search
Claughton Moor
Loading map...
Applicant/Operator Community Wind Power
County Council Lancashire County Council
Planning Authority
Planning Authority Reference
Number of Turbines 20
Power per Turbine 2.3MW
Turbine Height 125m
Position 54° 5' 12" N, 2° 36' 50" WLatitude: 54.086625
Longitude: -2.613812
OS Grid Reference
Wind Farm Status Proposal defeated
Parliamentary Constituency
Campaigner

Next to Caton Moor & 6km inside Forest of Bowland AONB - all applications now withdrawn.

Application History

Community Windpower originally submitted a scheme for 20 wind turbines. This application, reference number 09/01068/FUL was refused by Lancaster City Council on 31/03/2010.

An appeal against refusal was submitted (LCC reference 10/00022/REF, Planning Inspectorate Reference APP/A2335/A/10/2136414) but was withdrawn by Community Windpower before the inquiry commenced.

Community Windpower submitted a revised scheme for 13 turbines following the refusal of the 20 turbine scheme. Full details of this application: Click to view the details. They submitted an appeal against non-determination as LCC did not determine the application in 13 weeks. This appeal was withdrawn prior to determination.