HMP Haverigg

From Cumbria Wind Watch

Jump to: navigation, search
HMP Haverigg
Loading map...
Applicant/Operator Partnerships for Renewables/MOJ
County Council Cumbria County Council
Planning Authority Copeland Borough Council
Planning Authority Reference 4/12/2022/0F1
Number of Turbines 5
Power per Turbine 3MW
Turbine Height 120.5m
Position 54° 11' 44" N, 3° 19' 10" WLatitude: 54.195638
Longitude: -3.31933
OS Grid Reference
Wind Farm Status Application approved (by Local Authority)
Parliamentary Constituency
Campaigner

The Committee after originally being minded to refuse in April 2015 eventually approved the application in June. PFR plan to erect the windfarm in Autumn 2016


This is an application by the Ministry of Justice in partnership with Partnership for Renewables.

It will be adjacent to the present Haverigg Wind Farm and between the Prison (Category C) and the coast.

Details of application http://www.pfr.co.uk/haverigg/3484/Planning-Application-/