Harlock Hill

From Cumbria Wind Watch

Jump to: navigation, search
Harlock Hill
Loading map...
Applicant/Operator Baywind
County Council Cumbria County Council
Planning Authority
Planning Authority Reference
Number of Turbines 5
Power per Turbine 0.5MW
Turbine Height 53.5m
Position 54° 11' 36" N, 3° 10' 10" WLatitude: 54.1932455
Longitude: -3.1693277
OS Grid Reference
Wind Farm Status Operational
Parliamentary Constituency
Campaigner

An application submitted September 2011 for "Furness Wind Farm" includes plans to remove these five turbines to be replaced with larger, more powerful ones located over a wider area.