Langrigg Hall

From Cumbria Wind Watch

Jump to: navigation, search
Langrigg Hall
Loading map...
Applicant/Operator E. Thompson LLP
County Council Cumbria CC
Planning Authority Allerdale BC
Planning Authority Reference 2/2011/0589
Number of Turbines 4
Power per Turbine 0.020MW
Turbine Height 27m
Position 54° 47' 60" N, 3° 18' 1" WLatitude: 54.79998327297
Longitude: -3.3002433130276
OS Grid Reference
Wind Farm Status Operational
Parliamentary Constituency
Campaigner

Approved 7.10.11 by Allerdale BC